          DOMINION BOULEVARD CORRIDOR STUDY  |  Chesapeake, Virginia
        
        
          32  |  Existing Conditions
        
        
          Existing Conditions  |  33
        
        
          This strategic Master Plan advances work prepared to date including the 2035 Moving Forward
        
        
          Comprehensive Plan, the 2035 Land Use Plan, the 2050 Transportation Plan and the 2050 Trails
        
        
          Plan, adopted by City Council on February 25, 2014.
        
        
          Existing Conditions
        
        
          
            Figure 14: The Moving Forward Chesapeake 2035 plan was adopted in February 2014
          
        
        
          
            Figure 15: Chesapeake’s 2050 Master Transportation Plan